Maintenance questions rarely arrive in a tidy order. They come up mid-shift, when a spindle starts to chatter, when an axis drifts out of position, or when someone asks whether an older machine is worth keeping. This FAQ collects the questions our engineers hear most often from production engineers and maintenance managers, and answers them plainly.

Our engineers have worked on CNC machine tools in aerospace production since 2000. In our experience, most downtime is not caused by unusual failures. It comes from small, predictable things that were not scheduled, not stocked or not measured.

What is the difference between planned and reactive maintenance?

Reactive maintenance means fixing whatever broke when the machine stops. Planned maintenance means deciding in advance which checks and replacements are done on a schedule, and which you deliberately leave reactive because the risk is low and the part is cheap.

Most shops run a mix of both, and that is sensible. The aim is not to eliminate reactive work. It is to make sure the failures that matter, such as spindle bearings, drive faults and geometry drift, are the ones you have planned for.

What should we schedule, and what should we keep as spares?

Schedule the items that are predictable and disruptive when they fail: lubrication and filtration, spindle and axis checks, drive and cooling-system inspections, and any preventive work the machine builder specifies.

For spares, ask two questions about each part. How likely is it to fail this year? And how long would the machine stand if you had to order it from scratch? A part that is likely to fail and slow to source belongs on the shelf.

Which spares are worth stocking, and which can we order when needed?

Parts with short lead times can usually be bought when needed. Proprietary electronics, spindle assemblies and drive modules, especially for older controls, are where a stocked part earns its place.

Start with the parts that can cause further damage. A cooling failure can take out a spindle, and a spindle is not something you source overnight. Protecting the spindle and the drives behind it is usually where the first spares investment belongs. If a machine is critical to a contract and a part has a long lead time, the decision is really about risk, and we are happy to work through it with you.

Why do metrology and alignment matter?

Geometry errors grow with distance. A machine that is slightly out of square or out of level can produce good parts on short travels and then miss tolerance on long ones. The bigger the working envelope, the more this matters.

We measure before we draw conclusions. The first test on any machine is a ballbar test in the three main planes, which gives a quick overall picture of positioning, squareness, backlash and servo behaviour. Only if the ballbar results call for it do we move on to a laser interferometer or a rotary axis check. Results are reported in ISO 230-2 and ISO 230-4 format, written so that a production manager, a programmer and an operator can all follow them. More about our machine tool metrology.

How often should we check geometry and alignment?

It depends on the machine, the workload and the tolerances you hold, not on a number from a generic checklist. A fresh check is worthwhile after a crash, after a major repair, after the machine has been moved, and on a new installation once it has settled.

We recommend treating alignment as part of planned maintenance rather than something you reach for after parts go out of tolerance. Finding drift early is cheaper than finding it in a scrapped batch.

When should we call in a specialist for drives and spindles?

Call for help when a fault is intermittent, when it comes back after a reset, or when you are not sure of the cause. Intermittent drive faults and early spindle symptoms look minor at first and are easy to put off.

Escalate sooner if the machine is business-critical or the same fault keeps returning.

Do we need Siemens Sinumerik specialists?

If your machines run Sinumerik controls, it saves time to work with engineers who know them. We work with the 810D, 828D, 840C, 840D powerline and 840D sl, and we look at the control and the mechanics of the machine together, so you are not coordinating several specialists to solve one problem.

Can an older machine be retrofitted instead of replaced?

Often, yes, if the castings and structure are still sound. The first step is to measure the machine and confirm that its mechanical condition makes a control upgrade worthwhile. We cover that decision in more detail in CNC Machine Retrofit vs Repair: How to Decide When to Rebuild.

What does a first conversation involve?

We listen to how the machine runs, what is causing trouble and what you need from it, and we tell you honestly what we see. Sometimes that leads to a service visit, sometimes to a retrofit, and sometimes simply to a better maintenance plan. The decision is yours.

Book a no-obligation consultation.